Proposal by text
Text your job note and photos. Get back a finished proposal with three options and a link. Every text goes to one number: (626) 325-0175.
Start here
Five steps at the house
- Text visit and the customer's phone number, like visit 214-555-0142.
- Text what you found, in plain words, in any order. Add your price if you know it, like lift 950.
- Send your photos.
- Text create proposal. Answer anything it asks. You get three prices and a link.
- Show the customer the link on your phone. Text done when you leave.
What you will see
One visit, start to finish
Blue is what you textGrey is what comes back, word for word
The customer here is made up.
visit 214-555-0142
Visit started for Pat Sample, 412 Elm St, Frisco.
Wrong person? Text 'visit' with the right number.
Text me, in any order:
1) Area (driveway, walkway, patio, pool deck, steps)
2) How many sections
3) What you found (how far it dropped, void, cracks, trip hazard)
4) The fix (lift, void fill, stabilize)
5) Feet of sealant, or 'no sealant'
Send photos any time.
Then text 'create proposal'.
Know your price? Add it, like 'lift 950'.
driveway, down two inches, cracks. lift.
Got it. Keep going, or text 'create proposal'.
(a photo)
Got photo 1. Send more, add notes, or text 'create proposal'.
create proposal
Before I build, text me:
1) How many sections of the driveway, like '2 sections'.
2) How many feet of sealant, like '20 feet of sealant', or 'no sealant'.
2 sections, 20 feet of sealant
Draft ready:
Tear Out & Replace: $6,450
Lift, Fill & Seal: $1,610 (recommended, 1-year warranty)
Lift & Void Fill: $1,450 (no warranty)
(the proposal link)
1 photo attached.
Reply with a change, or 'send'.
local discount 150
Rebuilt:
Tear Out & Replace: $6,450
Lift, Fill & Seal: $1,460 (recommended, 1-year warranty)
Lift & Void Fill: $1,300 (no warranty)
(the same link)
Another change, or 'send'.
done
Visit closed. Text 'visit' to start another.
The jobs you quote most
Thirteen jobs, each with the exact text to send
Start each one with "visit" and the customer's number, and send photos. The tag on the right shows how often you quote that kind of job.
Your note can be the "create proposal" text itself, if it starts with "note:".
The tear-out price is worked out for you: 4 times the middle option. When a job has no sealant, the two lift options come back at the same price. Only the warranty line differs.
1. Lift and sealant
Text this
driveway, 2 sections by the garage, down two inches, cracks. Lift. 20 feet of sealant.
You get back
Tear Out & Replace $6,450 · Lift, Fill & Seal $1,610 · Lift & Void Fill $1,450
2. Lift and sealant, with a discount
Text this
driveway, 2 sections by the garage, down two inches, cracks. Lift. 20 feet of sealant. Local discount 150.
You get back
Tear Out & Replace $6,450 · Lift, Fill & Seal $1,460 · Lift & Void Fill $1,300
3. Lift, void fill and sealant
Text this
driveway, down two inches with a void. Lift 1450, void fill 1150. 81 feet of sealant, sealant 8.5 a foot.
You get back
Tear Out & Replace $13,150 · Lift, Fill & Seal $3,288.50 · Lift & Void Fill $2,600
4. Void fill and sealant
Text this
patio, 2 sections, a large void under the slab. Void fill. 43 feet of sealant. Discount 100.
You get back
Tear Out & Replace $4,600 · Void Fill & Seal $1,044 · Void Fill $750
5. Void fill, no sealant
Text this
walkway, a void under one section. Void fill 900. No sealant.
You get back
Tear Out & Replace $3,600 · Void Fill & Seal $900 · Void Fill $900
6. You already know your price
Text this
driveway, cracked and down an inch. Lift 950. 20 feet of sealant, sealant 7 a foot.
You get back
Tear Out & Replace $4,350 · Lift, Fill & Seal $1,090 · Lift & Void Fill $950
7. An optional line
Text this
driveway, 2 sections, down two inches. Lift. 20 feet of sealant. Optional void fill 500.
You get back
Tear Out & Replace $6,450 · Lift, Fill & Seal $1,610 · Lift & Void Fill $1,450
Optional add-on below the options: Eco-Rise Void $500
Optional add-on below the options: Eco-Rise Void $500
8. Two lifts on one driveway
Text this
driveway upper section, down two inches. Lift 1450. 40 feet of sealant.
add line: Eco-Rise (Driveway) lower section 1450
You get back
Tear Out & Replace $12,900 · Lift, Fill & Seal $3,220 · Lift & Void Fill $2,900
9. Two areas on one job
Text this
driveway 2 sections down two inches, lift. Walkway 1 section down an inch, lift. 30 feet of sealant on the driveway.
You get back
Tear Out & Replace $9,350 · Lift, Fill & Seal $2,340 · Lift & Void Fill $2,100
10. Pool deck with mastic
Text this
pool deck, 2 sections, settled an inch. Lift. 100 feet of mastic, mastic optional.
You get back
Tear Out & Replace $5,300 · Lift, Fill & Seal $1,325 · Lift & Void Fill $1,325
Optional add-on below the options: Pool Mastic $800
Optional add-on below the options: Pool Mastic $800
11. A trip lip to grind
Text this
walkway, 1 section, down an inch with a trip lip. Lift. Grinding 150. 12 feet of sealant.
You get back
Tear Out & Replace $3,900 · Lift, Fill & Seal $971 · Lift & Void Fill $875
12. A job far from the shop
Text this
driveway, 2 sections, down two inches. Lift. 20 feet of sealant. Mobilization 250.
You get back
Tear Out & Replace $7,450 · Lift, Fill & Seal $1,860 · Lift & Void Fill $1,700
13. A lift you can't promise
Text this
driveway, 2 sections, patched and fractured, down two inches. Lift, risky, $600 minimum. 20 feet of sealant.
You get back
Tear Out & Replace $6,450 · Lift, Fill & Seal $1,610 · Lift & Void Fill $1,450
If you leave something out
It asks before it builds. It never guesses a number.
| No finding or no fix | "What you found on the driveway and the fix, like 'down two inches, lift'." |
| No number of sections | "How many sections of the driveway, like '2 sections'." Skipped when you type the lift price. |
| A void with no size | "How big the void is: small, medium or large (or the price, like 'void fill 600')." |
| No feet of sealant | "How many feet of sealant, like '20 feet of sealant', or 'no sealant'." On a pool deck it asks about mastic. |
| No drop depth | It doesn't ask. It uses the list price. Say it, like "down two inches", and the lift price follows: under an inch is 10% less, three inches or more is 20% more. |
| The tear-out price | It never asks. It works it out: 4 times the middle option, to the nearest $50. |
| No photos | "No photos yet: send them, or text 'no photos' to build without." |
Commands · 1 · Start and stop
Open a visit for one customer
| visit 214-555-0142 | Starts a visit for the customer with that phone number. It texts back their name and address, then the list of what to send. |
| visit | With no number, it asks: "Which customer?" Nothing starts. |
| visit 214-555-0142 Laurie | Rarely needed. Two customers can share one number, like a husband and wife, or the same person entered twice. The first name picks the right one. |
| done | Closes the visit. stop, close and end visit do the same. |
2 · The note
Text what you found, in plain words, in any order
| Any plain text | Saved as part of the note. Reply: "Got it. Keep going, or text create proposal." Send as many as you like. |
| Must be in the note | Which area. How many sections. What you found, with how far it dropped. The fix. Feet of sealant, or "no sealant". Not the tear-out price: that is worked out for you. |
| Can be in the note | The cause, how many days out to schedule, a named discount, far from the shop, a risky lift, a note for the crew. |
| note: driveway 2 sections... | Adds that note and builds the proposal in the same text. visited: ... does the same. |
3 · Photos
Send them as they are
| A photo, before the proposal exists | "Got photo 1." It goes into the proposal when you build it. |
| A photo with words | The photo is kept, and the words count as part of the note. |
| A photo, after the proposal exists | It goes straight onto the proposal. "Photo 3 is on the proposal. Same link." About 30 seconds. |
4 · Build
Get the three prices and the link
| create proposal | Builds it. In about a minute you get the three prices, the link, and how many photos went on. create, build, make and generate work too. |
| If something is missing | It asks for all of it in one text. Just answer. Your answer builds the proposal. What it checks is listed under "If you leave something out". |
5 · Changes, after the proposal exists
Text the change. You get new prices and the same link.
| tear out 7000 | Replaces the worked-out tear-out price with your own, for when the sub gives a real one. auto tear out goes back to 4 times the middle option. |
| 4 sections or whole driveway | Changes the size, which changes the lift price. Sizes: a corner, 1, 2 to 3, 4 to 5, or the whole area. |
| add 8 feet of sealant on the driveway | Sets the sealant to the feet you give, in place of the estimate. |
| add the walkway, lift | Adds a second area as an optional add-on below the three options. |
| include the walkway | Moves that area into the two lift options, so their prices go up. |
| make the walkway optional | Moves it back out to an optional add-on. |
| drop the walkway | Removes that area. |
| grind the lip on the driveway | Adds grinding as an optional add-on. |
| local discount | With no amount, it only names the discount in the letter. Add the amount to change the price, like "local discount 150". Kinds: local, same day, referral, facebook, military, senior. no discount removes it. |
| 5 days out | Adds the scheduling line to the letter. The letter leaves it out unless you say it, here or in your note. |
| risky, $600 minimum | Marks the lift as risky and adds the cannot-guarantee paragraph with that minimum. not risky undoes it. |
| cause is the downspout | Sets the cause in the letter. Also: open joints, drainage, tree roots, poor compaction, sprinkler. |
| note for the crew: gate code 1234 | Adds a note for the crew. The homeowner doesn't see it. |
6 · Your own numbers
Type the price you'd really charge
| lift 950 | Sets the lift to your price, in place of the price list. With a typed lift price, it doesn't ask how many sections. |
| lift the walkway for 700 | Same, for one area when the job has more than one. |
| void fill 1150 | Sets the void fill price. If the job only had a lift, it adds a void fill line under it. |
| sealant 8.5 a foot | Sets the price per foot. Say "a foot" so it isn't read as feet. Same for mastic 8 a foot. |
| grinding 150 or mobilization 250 | Adds that line at your price. |
| optional void fill 500 | Adds it as an optional add-on, below the three options. |
| mastic optional | Moves the mastic to an optional add-on. include the mastic moves it back. Works for sealant too. |
| local discount 150 | Takes $150 off both lift options, as its own line. discount 100 and take 150 off work too. |
| add bottle jack 300 | Adds a line of your own to both lift options. add optional concrete patch 250 makes it an add-on. |
| add line: Eco-Rise lower driveway 1450 | With the word "line", it adds exactly what you type, whatever it's called. |
| drop the bottle jack | Removes a line you added. |
| reset prices | Clears your typed prices and goes back to the price list. |
The tear-out option
It's on every proposal, and you never price it
- The price is worked out: 4 times the middle option, to the nearest $50. A $1,610 middle option gives $6,450.
- It moves with the job. Change the lift price or add a line, and the tear-out follows.
- What it means: a full tear-out and re-pour. Demolition, haul-off, and a new 4-inch slab with rebar.
- A homeowner can pick it. If they do, Level King subcontracts the work.
- If the sub's real price is higher, type it: tear out 9000. auto tear out goes back to 4 times.
7 · Send
Off for now
| send | Reply: "Send is switched off." Nothing goes to the homeowner. You show them the link on your own screen. |
Good to know
Four things that save you a text
- Type your note. Voice notes are not read.
- Show the link on your own screen. "Send" is off for now, so nothing goes to the homeowner.
- To change the fix or how far it dropped, type the price. After the proposal exists, "void fill only" or "down 3 inches" are not read as changes. Type void fill 600 or lift 1500 instead.
- You never need to ask for a tear-out. The tear-out option is already on every proposal.
What you get back
The proposal always has the same shape
- Tear Out & Replace at 4 times the middle option, unless you type a price.
- Lift, Fill & Seal, recommended, with the 1- Year Warranty as a line.
- Lift & Void Fill, with no warranty.
- Optional add-ons below: the 5- Year Warranty at $500, plus any optional area or grinding.